Perlick Logo

 

Key Product Groups Lead Time
Refrigeration 5 Weeks
H Series Refrigeration 3 Weeks
Underbar 5 Weeks
Beverage Systems 5 Weeks
*Specific product group lead times listed below*

Product Group Current Lead Time
Bottle Coolers and Frosters 3 Weeks
Column Wine Reserves 3 Weeks
Backbar if containing custom Laminate 16 Weeks
Trunk Lines 4 Weeks
Power Pak 5 Weeks
Standard Beer Towers 5 Weeks
Custom Beer Towers 12 Weeks (contact factory to confirm)
Beer Towers if including Tarnish Free Finish 14 Weeks (previously 18 weeks)
Beer Towers if including Gold Finish 18 Weeks
Underbar if containing Tobin Ellis 5 Weeks
Underbar if containing CM 6 Weeks
Mobile Bars 8 Weeks
  • Mobile bar that contains custom vinyl wrap graphics option
Call Perlick for quote and ordering process as noted in the spec. sheet
  • Engineered Solid Surface Top
Additional 6 weeks possible
  • Containing refrigerated drawers
10 Weeks
Ice Cream Cabinets and Ice Vaults 5 Weeks
Glasswashers 6 Weeks
Nitro Coffee Kits 2 Weeks

Please take a moment to review our current lead times. The lead time is the number of weeks you can expect an order to ship from the time you place an order. Lead times are estimates and not guaranteed.

Changes to an existing order could result in that order receiving an adjusted lead time. Sales Order ship by dates are calculated to the longest product lead time on your purchase order. If you want products with shorter lead times to ship when complete, please make a notation on your PO.

For any questions about the lead time, status of an order, or changes to an existing order, please send an email to auto@perlick.com so a member of our customer service team can assist you.

Note for orders shipping outside of standard lead time:

Perlick is always ready to accept orders that need to ship outside of standard lead time. If you have orders that need to ship in the later summer or fall of this year, please send them in and specify the ship date you need for your project. Getting these projects on our radar helps us plan for the future and reserves your spot in the production queue in the event that lead times extend at any point throughout the year.

We offer free freight!

All free freight shipments are shipped with a Perlick preferred carrier and the most efficient method of shipment will be chosen. All prepaid shipments are Free On Board (F.O.B) Origin with ownership passing to the purchaser as soon as the product is loaded and the carrier signs the bill of lading, or when the carrier departs any Perlick or partner shipping dock. Applies to the lower 48 states and Canada. Excludes Alaska, Hawaii and international shipments (outside of Canada). Learn more here: Perlick Freight Policy

Chat with us!